• This access road requires practically a full restoration. 
  • This work is not subject to any type of aid or subsidy.
  • The company shas committed to contribute to the restoration work, the cost of which is more than 40 thousand euros.

Xallas Electricidad y Aleaciones, XEAL, will collaborate with the CEE local authority by financing 50% of the total cost of restoring the entrance road to Cee, where its factory is located. 

This access road, which requires almost a total remodeling of its infrastructure, is not subject to any type of aid or subsidy.

XEAL is committed to contributing half the cost of the restoration work, which totals more than 40,000 euros. 

The work includes the clearing and cleaning of ditches and edges; excavation, leveling and demolition to unify the  slopes and walls; the repair of the base and firm with gravel; the construction of the tread and priming; the painting of symbols, zebra crossings and surface islands; the adaptation of plumbing and sewerage to the new level, as well as the network connections; and the installation of a reflective octagonal STOP post and traffic sign.

Previous news Next news

You may be interested in